Contact Us

Harlum Welfare | Breeze

Flexible in-turbine welfare where access and weight matter.

Harlum Breeze is a modular, flat-pack welfare solution designed for internal turbine installation where external mounting is not suitable. The system moves into the turbine in manageable sections and is assembled in the selected location.

AgilePracticalEfficient

The internal route

Breeze gives project teams a practical route to turbine-side welfare when access, internal space and handling weight make a complete cabin difficult to move into place. It is designed around the access route rather than asking the access route to accommodate a standard unit.

Modular flat-pack construction

Components are designed to move through the turbine access route before assembly in position.

Modular system, constructed in three minutes

A straightforward assembly route supports efficient installation, subject to project review.

Lightweight handling

Individual sections reduce the burden of moving a complete cabin through constrained spaces.

Compact toilet system

A drop-box arrangement gives projects a practical internal welfare option where footprint is limited.

Key features

Access-led design

Openings, stairs, lifts, handling limits and the internal envelope are reviewed before deployment.

Project-fit location

The final position is agreed around available space, interfaces, safe access and how the unit will be used.

Configured handwash

Hot-water or hand-gel options can be selected around the project and service route.

Planned waste model

Container exchange, consumables, cleaning and authorised onshore handling are built into the O&M plan.

Practical turnaround

The unit is designed for inspection, cleaning, replenishment and efficient maintenance.

Private turbine-side welfare

Technicians have an enclosed facility within the turbine instead of relying solely on vessel access.

Designed around the access route

Before deployment, Harlum reviews the route from vessel or platform access to the intended internal location. That includes opening dimensions, stairs, lifts, handling limits, turning space, staging, assembly and the final service route. Breeze becomes a planned part of the turbine layout rather than an afterthought.

Fit review

The access route, internal envelope, floor area, assembly method and service responsibilities must be confirmed for the specific turbine and project.

From access review to operating support

1

Review the access route

Confirm openings, stairs, lifts, handling limits, internal envelope and the preferred installation location.

2

Plan the assembly

Agree how components will be transported, staged and assembled safely within the turbine.

3

Configure the facilities

Select the toilet, handwash and waste model, plus inspection and replenishment requirements.

4

Install and hand over

Complete assembly, checks, user guidance and service-team training around the agreed method.

5

Maintain and support

Align cleaning, container exchange, consumables and turnaround with planned turbine visits.

Supporting a more inclusive offshore workforce

Breeze helps make inclusive welfare possible even where external mounting is unsuitable. A compact internal facility gives women and other technicians a private place to manage menstruation, personal hygiene, medication and everyday needs without planning the shift around the next vessel return.

  • Brings privacy and hygiene into turbines where access and weight restrict conventional welfare units.
  • Allows handwashing and sanitary-waste provision to form part of the chosen configuration.
  • Makes the promise of an inclusive workplace more credible for candidates and existing teams.
  • Supports anyone managing a health condition, medication or personal need during a long offshore shift.

A controlled service route

The toilet, handwash and waste model are planned with the O&M route. Container exchange, cleaning, consumables and replenishment can be aligned to planned turbine visits, with sealed waste returned through the agreed vessel, port and authorised onshore process.

Frequently asked questions.

How does Breeze reach the installation location?

The system is moved in as separate modules. Harlum reviews dimensions, weights, access restrictions, staging and manual or mechanical handling before agreeing the method.

How quickly can Breeze be assembled?

The six-bolt assembly is designed to be straightforward. Actual installation time depends on the access route, location, permits, lifting or handling method and project controls.

What toilet system is used?

Breeze can use a compact drop-box toilet arrangement. The final toilet, handwash and waste-service configuration is selected during the project review.

Can Breeze be serviced during planned O&M visits?

Yes, subject to the agreed route. Cleaning, consumables and container exchange can be planned around existing vessel and turbine access where the project arrangements allow.

Start with the access route and build the welfare around it.

Share the turbine model, internal access dimensions, intended location and working pattern. Harlum will review whether Breeze is the right fit.

We use third-party cookies to personalise content and analyse site traffic.

Learn more